Time that would be necessary to reach an agreed value for the task or controlled variable if its max. rate of change from the initial value of the output variable to the agreed value were to remain effective (DIN 19 226).
Fluidlexikon
Time that would be necessary to reach an agreed value for the task or controlled variable if its max. rate of change from the initial value of the output variable to the agreed value were to remain effective (DIN 19 226).
HAWE Oil-Hydraulic Technology (Shanghai) Co., Ltd.
155 Jindian Road
201206 PuDong / Shanghai
P.R. China
China
电话: +86 21 58999678
info (at) hawe.com.cn